(850) 606 PNNY (7669) info@leonpenny.org

Northeast Connector Corridor

Regional Mobility

Overview

This project encompasses a holistic approach to transportation capacity improvements, regional mobility, connectivity to existing/proposed amenities, and enhances the water quality of the Bradfordville area. The roadway will have paved shoulders, provisions for future transit, and landscaped medians. Gentle swales will run along the road to capture water runoff preserving the more rural character of the area.  The sidewalks and trails along the roadway will interconnect to the existing neighborhood sidewalk networks to provide residents access to regional amenities.

 


N

Relieves congestion by widening Bannerman Road to four lanes from Thomasville Road to Tekesta Drive. 

N

Estimated Cost: $33.3 million

N

Increases pedestrian and bicycle access with multi-use paths and sidewalks.

N

Expands the Greenways System by constructing the Meridian Road Trail from Bannerman Road south to Lake Overstreet.